+
  • 测试车.png

AST-9000C of charging pile mobile test platform


At present, the on-site testing requirements for AC/DC charging piles can be roughly divided into on-site testing items required by the national standard, document No. 45 of the national network, the energy bureau and local governments, such as metrological verification, mutual grip testing, protocol consistency testing, energy standard testing, factory testing and arrival acceptance. For on-site inspection, it is generally network inspection and periodic inspection, which involves measurement verification, interoperability testing, protocol conformance testing and on-site safety inspection procedures. At present, the field test of charging pile needs to carry high-power load and various precision instruments, which greatly increases the test difficulty and the accuracy of data cannot be guaranteed: therefore, our company has introduced an integrated mobile detection platform for electric vehicle charging equipment. The mobile carrier is a special modified vehicle with long fuel mileage (pure electric platform can be selected), which can realize large-scale mobile test deployment across provinces and cities, to meet the actual application scenarios of charging piles, such as public charging stations, private charging stations, special charging stations, residential areas and underground parking lots and other special charging environments.

Key words:

Field Test

Service Hotline:

Product Description

Message consultation